5. INFRASTRUCTURE, HOUSING AND TRANSPORT
5.1 Infrastructure
Regarding infrastructure, the town has asphalt road connecting it to different woreda, zone, region and Addis Ababa. In the town there is 7.1km asphalt road. In addition to these; the town gets 24 hours electric supply from the national grid, and has mobile and fixed telephone lines. The main water supply source of the town is potable underground water distributed with piped network system and 25 public water distribution points. The town has open ditches to discharge storm water.
5.2 Housing
There are 592 private and government owned houses built of Hollow Concrete Block. Mud, wood, stone, sand, and Hollow Concrete Blocks are widely available construction materials in the town.